Workers ride from MTA Eastside Access to 140 feet below Grand Central. (Long Island Capital Construction) #0516_15.jpg ©c price
Fresh Air intake pipes, typical for the ongoing MTA Capital Construc. projects. #0580.jpg ©c price
Tunneling for the Second Ave subway. Opening to Street level is around 60 Street. #0527_1.jpg ©c price
Second Ave Subway near future 72 Street station. 0488.jpg ©clayton price
Large piece Tunnel Boxing machine, in open cut, prior to moving from Queens into underground position. 0542.jpg © clayton price
Tunnel Boxing (drilling rig), component inspection. 0562.jpg ©clayton price
Photograph of Michael Horodniceanu, president of MCA Capital, with several workers, in the 2nd Ave Subway. #0494.jpg © c price
"Sand hogs" working to clear rock debris from blasting at the 2nd Ave Subway. #0502.jpg © clayton price
Welding a ceiling form deep under-ground, in the #7 Train Extension to 34th St. #0681.jpg ©clayton price
Form Meets Function. Concrete forms hold sprayed cement in place, while it hardens.# 0669.jpg ©clayton price
Connecting walkway, #7 Line Extention, under construction. #1593.jpg ©clayon price
Early excavation at eleventh Ave at 34 St. for New #7 Station. (note: Javits Center above bridge.)#cjp_1626.jpg © clayton price
Complex for new No. 7 line station, adjacent to Javits Center.1632.psd ©c price
Filling vertical walls with Shotcrete (sprayed cement) - No. 7 line, 34 St station 1653_2.jpg
Entrance area for No.7 line subway station: 32 St and 11th Ave - Manhattan. 0650.jpg ©clayton price
Underground resting area for subway workers, this one on the No.7 line, west side of Manhattan. 0613.jpg
0531.jpg New Ceiling Forms arriving at site. Second Ave subway site. #0531.jpg ©c price
Rock anchors used to strengthen and hold rock from moving. Second Ave subway site. #0533.jpg
Second Ave Subway - workers preparing concrete forms.# 0647.jpg
Workers preparing under structure for cementing this tunnel, deep under Grand Central Station.1293.JPG
Crew drilling for ceiling supports: Tunnel under Grand Central Station 0607.jpg ©clayton price
Track interchanges and switching work deep under the city. 0570.jpg ©clayton price
Form for passenger elevator, down from Grand Central. 1363.JPG
#-MG_0702.jpg
Temporary construction track under Grand Central Station.#1334.jpg © clayton price
Inspection walk to Times Square. Pre-manufactured segments for new track to 34th St.extension of No. 7 line. #0736,jpg © c price
Pre-Manufactured segments for subway tunnel. #0684.jpg © clayton price
Workers clear # 7 Line completed tunnel of pre- manufactured segments. #0672.jpg ©clayton price
Never Out of Style! Shovel - #0522.jpg © clayton price
#0671.jpg - No. 7 line - 34St station under construction. © clayton price
No. 7 line new tunnel beginning - Times Square #MG_0766 ©clayton price
End of current No, 7 train at Times Square (42 St) 0764_1.jpg ©clayton price
Fulton Street subway station. Manhattan Financial District. #1099.jpg © clayton price